My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-23_GENERAL DOCUMENTS - C1981041
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981041
>
2018-01-23_GENERAL DOCUMENTS - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2018 1:45:42 PM
Creation date
1/23/2018 1:44:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
1/23/2018
Doc Name Note
For RN7
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Snowcap Coal Company, Inc
Permit Index Doc Type
Findings
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> 24 C1981-041 RN7 findings <br />Certain roads have been retained for postmining use, in accordance with landowner requests for use <br />following completion of mining and reclamation. Road retention narrative and documentation is <br />provided on Page 14-14 and in Appendix 14-5. New Access Road 1A, has been retained in its entirety <br />for the alternative postmining land use, as will a short upper segment of existing Access Road 1. <br />Landowner request for retention of these road segments is provided on Appendix pages A14-5-29 and <br />A14-29-30. In addition to the haul road and access road segments specified below, portions of Light <br />Use Road 1, Light Use Road 6, and Light Use Road 4 which were pre-existing, minimally modified <br />and used only occasionally by the operator, will be retained following reclamation in accordance with <br />landowner requests. <br /> <br />A. Haul Roads <br /> <br />1. The permittee has made a demonstration, based on site-specific precipitation rates, percent <br />of grade, and soil properties, that use of alternative specifications for culvert and bridge <br />sizing will not result in increased erosion. The Division therefore proposes to approve the <br />use of the alternative specifications for the following culverts or bridges, also referred to <br />as the "dip-sections," where Haul Roads 2, 3, and 4, cross Coal Gulch. The structures are <br />depicted on Exhibits 8A, 9A, 10B, 19, and 51 (4.03.l(4)(e)(vi)). <br /> <br />2. The operator and landowners have requested retention of Haul Road 4 from the CRDA-1 <br />turnoff to the CRDA-3 turnoff, and the entire length of Haul Road 5. Also, Haul Road 3 <br />between the county road and the rail loop will be retained for the postmining land use in <br />its present configuration. The subject roads comply with all applicable performance <br />standards, retention is compatible with the approved postmining land use, and written <br />landowner requests for road retention have been provided (4.03.1(1)(f). These roads have <br />all received Phase III bond release, and subsequently, have been removed from the permit <br />area (TR-0). This information is retained in this document for historical purposes. <br /> <br />B. Access Roads <br /> <br />1. The operator and landowners have requested the retention of a short segment of Access <br />Road 1, and the entirety of Access Roads 1A, 2, and 3 as documented in Appendix 14 -5. <br />Retention is compatible with the approved post mining land use and landowner desires, <br />and the roads comply with all applicable performance standards. Therefore, the Division <br />has approved retention of the access roads as specified in Appendix 14-5 (4.03.2(l)(f)). <br /> <br />II. Support Facilities - Rule 4.04 <br /> <br />Two warehouse buildings at the South Portal facilities area will remain permanent at the <br />request of the landowner and in support of the commercial and industrial post-mining land <br />use. The support facilities have received Phase III bond release approval. The Unit Train <br />Load Out and associated facilities have been approved to remain permanently and are used by <br />Halliburton for commercial and industrial activities. The Unit Train Load Out has been <br />approved for Phase III bond release and has been removed from the permit area. <br /> <br /> <br />III. Hydrologic Balance - Rule 4.05
The URL can be used to link to this page
Your browser does not support the video tag.