Laserfiche WebLink
APPENDIX H <br />GROUNDWATER MONITORING <br />Monitoring of groundwater will be conducted on a total of eight monitoring wells. Seven <br />existing wells are located in and around the site. The locations of the wells are shown on Figure <br />H-1 with information on the wells provided on Table H-1. <br />The wells will be initially monitored on a monthly basis until completion of slurry wall <br />construction, which includes approval of the leak test from the Colorado Division of Water <br />Resources. After that, monthly monitoring will be conducted for one year, then on a quarterly <br />basis for the life of the permit. <br />The water levels in the wells will be measured using an electronic water level indicator by <br />Fremont personnel. The data will be forwarded by D&A on an annual basis for review and then <br />submitted to DRMS. <br />The primary well that will determine mounding trigger level response (construction of a drain) <br />will be Well 8 (to be drilled after approval of TR-4) located along the western permit boundary <br />on Operator's property. Should this well rise to 6 feet below ground surface, a drain will be <br />designed and installed to mitigate mounding. <br />H-1