Laserfiche WebLink
Plan for Adoption of NPLs Climax Molybdenum Company <br /> at Groundwater POC Wells Permit No. M-1977-493 <br /> Step 3: Consensus Development <br /> As a result of the technical analysis and interim progress meetings with the agencies, Climax will <br /> prepare a draft Consensus Document for review by WQCD and DRMS. It is anticipated that the <br /> areas on which consensus should be pursued will include use classification, specified area, and <br /> site-specific ground water standards in each basin. Additional meeting(s)with WQCD and DRMS <br /> on consensus development may be warranted and will be scheduled, if necessary. <br /> 4.0 Timeframes for WQCC Process and Follow up DRMS Process (TBD) <br /> The steps and schedule for a WQCC process and a follow up DRMS process will be proposed <br /> once the work identified above is accomplished. The status of consensus development and input <br /> from the agencies will inform the next steps in the schedule. <br /> Page 4 <br />