Laserfiche WebLink
Second Submittal <br /> List of Figures <br /> Figure 1 Project Location and Area Features <br /> Figure 2 Ditches, Drains and Permitted Gravel Operations <br /> Figure 3 Summer 2017 Groundwater Elevations <br /> Figure 4 Site Monitoring Well Depths to Groundwater <br /> Figure 5 Top of Pierre Shale <br /> Figure 6 Alluvial Aquifer Thickness <br /> Figure 7 Local Groundwater Elevations and Flow Directions <br /> Figure 8 Conceptual Groundwater Flow Model <br /> Figure 9 Model Domain in Colorado State Plane Coordinates (Feet) <br /> Figure 10 Numerical Model Boundaries <br /> Figure 11 Simulated vs. Measured Groundwater Elevations <br /> Figure 12 Simulated 2017 Groundwater Contours <br /> Figure 13 Mining Plan—Phase 1 and 2 <br /> Figure 14 Mining Plan—Phases 3 and 4 <br /> Figure 15 Mining Phase 5 and Perimeter Drain Cross Section <br /> Figure 16 Predicted Drawdown at the End of Phase 1 <br /> Figure 17 Predicted Drawdown at the End of Phase 2 <br /> Figure 18 Predicted Drawdown at the End of Phase 3 <br /> Figure 19 Predicted Drawdown at the End of Phase 4 <br /> Figure 20 Predicted Drawdown at the End of Phase 5 <br /> Figure 21 Predicted Drawdown after Reclamation <br /> List of Appendices <br /> Appendix A Neighborhood Well Questionnaire and Notes <br /> Appendix B Knox Pit Monitoring Well Logs and Report <br /> Appendix C Northern Boundary— Flux Estimate <br /> Appendix D Specific Capacity Analyses <br /> Appendix E Site-Specific Aquifer Tests <br /> Appendix F Miscellaneous Calculations and Model Documentation <br /> Loveland Ready-Mix Concrete iv Telesto Solutions,Inc. <br /> 20190112_groundwmmwdy_2nd,ubnuna1 dmx January 2018 <br />