My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-12_REVISION - M2000041 (32)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000041
>
2018-01-12_REVISION - M2000041 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 8:19:24 AM
Creation date
1/16/2018 1:31:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
Revision
Doc Date
1/12/2018
Doc Name
Adequacy Review Response #2
From
Fremont Paving and Redi-Mix
To
DRMS
Type & Sequence
TR4
Email Name
ERR
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 -GENERAL REQUIREMENTS <br /> SECTION 01010-SUMMARY OF WORK <br /> Furnish all equipment,labor,and materials for construction of the complete Stonewall Springs Quarry Southwest <br /> Reservoir Slurry Wall as detailed in the Construction Documents. The work includes,but is not limited to,the <br /> following work items: <br /> ■ Mobilization to and demobilization from the site of all equipment,personnel,and materials required to <br /> complete the work. <br /> ■ Slurry wall platform construction including construction of an earthen embankment. <br /> ■ Soil-bentonite slurry wall construction including slurry wall platform construction. <br /> ■ Construction of a slurry wall cap and grading/cleanup of excess soil-bentonite backfill and supplemental <br /> fines at the surface. <br /> ■ Construction of a roller compacted concrete spillway and all ancillary components. <br /> ■ Grading a spillway channel. <br /> ■ Final grading including the road,spillway channel,and area surrounding the reservoir. <br /> ■ As-constructed survey documenting the completed construction including final elevations and contours of <br /> all structures or features built as part of this project. <br /> END OF SECTION <br /> 12/17 Section 01010-Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.