My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-16_REPORT - M1980047 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980047
>
2018-01-16_REPORT - M1980047 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 9:00:42 AM
Creation date
1/16/2018 12:16:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980047
IBM Index Class Name
REPORT
Doc Date
1/16/2018
Doc Name
Annual Fee/Report/Map
From
Exxon Mobil
To
DRMS
Annual Report Year
2017
Email Name
THM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page4 of3 <br /> Total acres Total acres Total acres Total acres <br /> backfilled: 3�f��" seeded w/ w/topsoil a 7 mulched w! a�. <br /> a oved mi re laced aqxwed mukk <br /> Is�ah� Tate, p 1 T <br /> feRfiTanamn-° %d5— replacenert 1&-10" 1 <br /> a vd ferfTaer I depth(n.) <br /> Seed t/p..L«r,- Fertilizer L .ws Mukb �'^�S.> *<r- <br /> application u `?;'-�% application Iya r��� G '"" application ny�v, <br /> method: `�` '�' method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES ' NO NIA <br /> If"YES", indicate the weed species,control area,control type,application rate and treatment date on the repo map. <br /> 14. Is adequate topsoil reserved for reclamation,based on your approved permit? ES NO N/A <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(l)? YES NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of tbS� <br /> Engineer(Well Permit,S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO N/A <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO N/A <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES NO N/A <br /> 19. is your basis for legal right to enter still valid? NO <br /> IN <br /> 20. Does your permit require you to submit monitoring information annually? YES � NIA <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S.34-32-1 16 or 34-32.5-1 16),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: <br />
The URL can be used to link to this page
Your browser does not support the video tag.