Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#001 Page 11 of 11 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: BRIGHTON,CO <br /> Total one-way travel distance: 6.40 miles <br /> Average Travel Speed: 32.00 mph <br /> Total Non-Roadable Mob/Demob Cost <br /> `*two round trips with haul rig: $7,175.22 <br /> Total Roadable Mob/Demob Cost** $96.69 <br /> **one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.20 0.20 <br /> Return Time(Hours): 0.20 0.20 <br /> Loading Time(Hours): 0.60 NA <br /> Unloading Time(Hours): 0.60 NA <br /> Subtotals: 1.60 0.40 <br /> JOB TIME AND COST <br /> Total job time: 3.20 Hours <br /> Total job cost: $7,272 <br />