Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 026 Page 3 of 3 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%} <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />1 <br />(Ft) <br />(%) <br />{%) <br />(fpm) <br />Time <br />LCY/Hour Adjusted for job efficiency: <br />395.34 LCY/Hour <br />Truck Unit Production <br />min <br />1 <br />750.00 <br />5.00 <br />4.00 <br />9.00 <br />824 <br />0.946 <br />Haul Time: <br />Return Rnute-. <br />0.946 <br />minutes <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade (°/a} <br />-5.00 <br />Roll. Res <br />(%) <br />4.00 <br />Total Res Velocity Travel <br />(%) (fpm) Time <br />min <br />-1.00 3159 0.297 <br />Total Truck Cycle Time: 4.093 <br />1 <br />750.00 <br />CIRCES Cost Estimating Software <br />Return Time: 0.297 <br />minutes <br />Total Truck Cycle Time: 4.093 <br />minutes <br />Loading Tool unit <br />Production <br />476.31 <br />LCY/Hour Adjusted for job efficiency: <br />395.34 LCY/Hour <br />Truck Unit Production <br />226.92 <br />LCY/Hour Adjusted for job efficiency: <br />188.35 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 376.69 <br />LCY/Hour <br />Adjusted single trucklloader team production: 376.69 <br />LCY/Hour <br />Adjusted multiple trucklloader team production: 376.69 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />I <br />Team(s) Total job time: 5.76. <br />Hours <br />Unit cost: <br />$1.404 <br />/LCY Total job cost: $3044 <br />CIRCES Cost Estimating Software <br />