Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 024 Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Regrade ditch D5 <br />Site: Colowyo Coal Mine <br />PROJECT IDENTIFICATION <br />Task #: 024 <br />Date: 3/1512017 <br />User: ZTT <br />Permit Action: 13C <br />State: Colorado <br />County: Moffat <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Cat D8T - 8SU <br />310 <br />Semi -Universal <br />NA <br />(CRG), <br />r�� <br />Permit/Job#: _C1981019 <br />Abbreviation: None <br />Filename: C019-024 <br />Total unit Cost/Hour: _$171.97 <br />Total Fleet Cost/Hour: $171.97 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,727 <br />Swell factor: 1.000 <br />Loose volume: 1,727 LCY <br />Source of estimated volume: _Exhibit 7-23B, Table 1, Exh. 7 -item 23, Fig. B -I <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />1,400.0_ LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: -20% <br />Average site altitude: 7,500 feet <br />Material weight: 2,650 Ibs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Utilization % <br />Ownership Cost/Hour- <br />$83.81 <br />Material consistency: <br />NA <br />Operating <br />Operating Cost/Hour: <br />$_46.32 <br />1.200 _ _ <br />(- <br />_ <br />Ripper own. Cost/Hour: <br />$0.00 <br />(AVG.) <br />NA__ <br />Ripper op. Cost/Hour: <br />$0,00 <br />0 <br />Operator Cost/Hour: <br />$41.85 <br />NA <br />Total unit Cost/Hour: _$171.97 <br />Total Fleet Cost/Hour: $171.97 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,727 <br />Swell factor: 1.000 <br />Loose volume: 1,727 LCY <br />Source of estimated volume: _Exhibit 7-23B, Table 1, Exh. 7 -item 23, Fig. B -I <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />1,400.0_ LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: -20% <br />Average site altitude: 7,500 feet <br />Material weight: 2,650 Ibs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />0.900 <br />CAT HB <br />Dozing method: <br />1.200 _ _ <br />(S -BY -S) <br />Visibility: <br />_ <br />1.000 <br />(AVG.) <br />