Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 022 Page 2 of 2 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.426 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.868 <br />Blade type: <br />1.000 <br />Net correction: 0.6657 <br />Adjusted unit production: 931.98 LCY/hr <br />Adjusted fleet production: 931.98 LCY/hr <br />JOB TIME AND COST <br />Fleet size: l Dozer(s) <br />Unit cost: $0.185/LCY <br />Total job time: 5.85 Hours_ <br />Total job cost: $1,005 <br />I SHIFT/DA <br />(FND-RF) <br />(CAT HB <br />:AT HB <br />:AT HB <br />(PAT) <br />