Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 021 Page 1 of 2 <br />BULLDOZER WORK <br />Task description: REgrade ditch D2 <br />Site: Colowy_oCoal Mine <br />PROJECT IDENTIFICATION <br />Task #: 021 <br />Date: 311512017 <br />User: ZTT <br />Permit Action: 13C <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS {, <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Cat D8T - 8SU <br />310 <br />Semi -Universal <br />NA <br />1 per day <br />_(CRG) ._ <br />Ownership Cost/Hour; <br />Operating Cost/Hour. <br />Ripper own. Cost/Hour: <br />Ripper op. Cost/Hour. <br />Operator Cost/Hour: <br />Total unit Cost/Houn <br />Total Fleet Cost/Hour: <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: CO 19-021 <br />$ I91.83 <br />$191.83 <br />MATERIAL UANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />3,150 <br />1.125 <br />3,544 LCY <br />Source of estimated volume: Exhibit 7-23B, Table 1, Exh. 7 -item 23, Fig. B-1 <br />Source of estimated sweII factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />1,400.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-20% <br />7,500 feet <br />2,650lbs/LCY <br />Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Utilization % <br />$83.81 <br />0.750 <br />NA <br />$66.17 <br />0.900 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />$ I91.83 <br />$191.83 <br />MATERIAL UANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />3,150 <br />1.125 <br />3,544 LCY <br />Source of estimated volume: Exhibit 7-23B, Table 1, Exh. 7 -item 23, Fig. B-1 <br />Source of estimated sweII factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />1,400.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-20% <br />7,500 feet <br />2,650lbs/LCY <br />Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />0.900 <br />CAT <br />Dozing method: <br />1.000 <br />GEN. <br />Visibility: <br />1.000 <br />AVG. <br />