Laserfiche WebLink
Bulldozer Worksheet Cont'd <br />Task # 0l6 Page 2 of 2 <br />Job efficiency: <br />0.830 <br />(l SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: 425.22 LCY/hr <br />Adjusted fleet production: 425.22 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozen(s) <br />Unit cost: $0.540/LCY <br />Total job time: 144.16 Hours <br />Total job cost: $33,109 <br />