Laserfiche WebLink
Bulldozer Worksheet Cont'd <br />Task # 015 Page 2 of 2 <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FMD -RF) <br />Push gradient_ <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: 425.22 LCYlhr <br />Adjusted fleet production: 425.22 LCYJhr <br />JOB TIME AND COST <br />Fleet size: 1 Dozen(s) <br />Unit cost: $0.540ILCY <br />Total job time: 52.38 Hours <br />Total job cost: $12,031 <br />