Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 0l4 Page 1 of 2 <br />Task description: <br />BULLDOZER WORK <br />Section 26 Pond Removal <br />Site: Colowyo Coal Mine Permit Action: 13C <br />PROJECT IDENTIFICATION <br />Task #: 014 State: Colorado <br />Date: 3/15:12017 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower. <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour. <br />Total unit Cost/Hour: $229.67 <br />Total Fleet Cost/Hour: $229.67 <br />MATERIAL QUANTITIES <br />$100.59 <br />$87.23 <br />$0.00 <br />$0.00 <br />$41.85 <br />Initial Volume: 10,400 <br />Swell factor: 1.125 <br />Loose volume: 11,700 LCY <br />Source of estimated volume: Exh 7,1tem 23,Fig. C6 <br />Source of estimated sweII factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />120 feet <br />1,093.1 LCY <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: C019-014 <br />Utilization % <br />NA <br />__100 <br />NA <br />� <br />0 <br />NA <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />6,900 feet <br />2650 Ibs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75%. Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />0.900 <br />(CAT HB <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />AVG. <br />