Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 007 Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Regrade Topsoil for Collom Haul Road <br />Site: Colowyo Coal Mine Permit Action: 13C <br />PROJECT IDENTIFICATION <br />Task #: _007 State: Colorado <br />Date: 3!15/2017 County, Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DI IT -IIU <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />I -shank ri er <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />_ <br />(GEN.) <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. Cost/Hour; <br />Ripper op. Cost/Hour; <br />Operator Cost/Hour: <br />Total unit Cost/Hour. <br />Total FIeet Cost/Hour: <br />$473.67 <br />$1,899.66 <br />Utilization % <br />$226.13 1 NA <br />$183,90 <br />$21.79 <br />$0.00 <br />$41,85 <br />100 <br />NA <br />0 <br />NA <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: C019-007 <br />MATERIAL QUANTITIES <br />packed <br />Initial Volume: <br />383,107 <br />Swell factor: <br />1.000 <br />Loose volume: <br />383,107 LCY <br />Source of estimated <br />volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 2,870.3 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />7,600 feet , <br />2,550 Ibs/LCY <br />Weight description: Earth - Dry <br />packed <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />AB.AVG. <br />Material consistency: <br />1.200 <br />JCAT HB) <br />Dozing method: <br />1.000 <br />_ <br />(GEN.) <br />Visibility: <br />_ <br />1.000 <br />AVG. <br />