Laserfiche WebLink
Scraper Worksheet Cont'd Task # 004 Page I of 2 <br />SCRAPER TEAM WORK <br />Task description: Haul Spoil to Collom Haul Road <br />Site: Colowyo Coal Mine Permit Action: 13C <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 3115/2017 County: Moffat <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: _ C019-004 <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: <br />-Dozer: <br />Support Equipment -Load Area: <br />-Dump Area - <br />Road Maintenance -Motor Grader: <br />-Water Truck: <br />Cat 637G <br />NA <br />NA <br />CAT1 <br />Water <br />COSTShift basis: leer day <br />Cost Breakdown: Scraper Work Team Sunnort Eouioment Maintenance Eauinment <br />Total work team cost/hour: $2,888.25 <br />MATERIAL QUANTITIES <br />Initial volume: 1,116,301 CCY Swell factor: 1.125 <br />Loose volume: 1,2552839 LCY <br />Source of estimated volume. Table 7 Exh. 13B -T-20 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,650 lbs/LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 30.79 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume. 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume; 29.00 <br />Adjusted Capacity: 29.00 <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$152.84 <br />NA <br />NA <br />NA <br />$72.40 <br />$24.01 <br />Operating cost/hour: <br />$158.39 <br />NA <br />NA <br />NA <br />$14.49 <br />$8.53 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.26 <br />NA <br />NA <br />NA <br />$28.90 <br />$0.00 <br />Unit Subtotals: <br />$342.49 <br />NA <br />NA <br />NA <br />$115.79 <br />$32.54 <br />Number of Units: <br />8 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$2,739.92 <br />Support: <br />$0.00 <br />Maint: <br />$148.33 <br />Total work team cost/hour: $2,888.25 <br />MATERIAL QUANTITIES <br />Initial volume: 1,116,301 CCY Swell factor: 1.125 <br />Loose volume: 1,2552839 LCY <br />Source of estimated volume. Table 7 Exh. 13B -T-20 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,650 lbs/LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 30.79 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume. 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume; 29.00 <br />Adjusted Capacity: 29.00 <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />