My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-11_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-01-11_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 12:59:35 PM
Creation date
1/11/2018 12:45:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/11/2018
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Colowyo Coal Company
Type & Sequence
RN7
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: —Rip 29,4581 of Collom Haul Road <br />Site: Colowyo Coal Mine Permit Action: 13C Permit/Job#: C 1981019 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 3/15/2017 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: OBSOLETE- Cat DI IR - <br />11SU <br />Ripper Attachment: l -Shank Ripper <br />Abbreviation: None <br />Filename: C019-003 <br />Horsepower: <br />850 <br />Shift Basis: <br />1 2er da <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />feet/second <br />3.00 <br />mph <br />7.94 <br />Utilization % <br />Ownership Cost/Hour: <br />$220.12 <br />NA <br />Operating Cost/Hour: <br />$235.69 <br />100 <br />Ripper Ownership Cost/Hour: <br />$21.79 <br />NA <br />Ripper Operating Cost/Hour: <br />$11.30 <br />100 <br />Operator Cost/Hour: <br />$41.85 <br />NA <br />Total Unit Cost/Hour: <br />$530.75 <br />Total Fleet Cost/Hour: <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />$12061.49 <br />Selected estimating method: <br />Seismic: NA Bank Volume: NA <br />Area: 18.90 acres Rip Depth (ft): 1.50 <br />Source of estimated quantity: Table 7 Exh, 13B -T-20 <br />HOURLY PRODUCTION <br />Seismic: <br />Area: <br />Seismic Velocity: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />Site Altitude: <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />Area <br />BCY NA <br />Volume. 45,738 BCY or CCY <br />NA <br />feet/second <br />3.00 <br />mph <br />7.94 <br />degrees <br />300.00 <br />feet <br />88.00 <br />feet <br />0.25 <br />feet <br />0.897 <br />acres/hour <br />0.897 <br />Acres/hr <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 2 Grader(s) <br />7,500 <br />1.00 <br />0.83 <br />0.83 <br />0.74 <br />1 An <br />Total job time: <br />feet <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Acres/hr <br />Acres/hr <br />12.70 Hours <br />Unit cost: $713.149 Per acre Total job cost: $13,478 <br />
The URL can be used to link to this page
Your browser does not support the video tag.