My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-03_REVISION - C1994082 (30)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2018-01-03_REVISION - C1994082 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 7:30:58 AM
Creation date
1/11/2018 6:43:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
1/3/2018
Doc Name
Notice of Proposed Decision
From
DRMS
To
Seneca Property, LLC
Type & Sequence
RN4
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AViCOLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Departrnent of Natural Resources <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />The Colorado Division of Reclamation, Mining and Safety, in accordance with C.R.S. 3433109(7), <br />proposes to Approve the renewal of a permit to conduct surface coal mining and reclamation <br />operations at the Yoast Mine, Permit No. C-1994-082. <br />This decision is based on a review of the complete and accurate application and the existing permit, <br />including all conditions and revisions approved up to January 3, 2018. In accordance with C.R.S. <br />3433109(7)(x), the Division makes the following determinations which warrant that the permit be <br />renewed: <br />The terms and conditions of the valid, existing permit are being satisfactorily met; <br />2. The present surface coal mining and reclamation operation is in compliance with all <br />requirements of the Colorado Surface Coal Mining Reclamation Act, C.R.S. 3433101 et <br />seq., and the Regulations promulgated thereunder; <br />The renewal requested does not substantially jeopardize the permittee's continuing <br />responsibility on existing permit areas; <br />4. The operator has provided evidence that the performance bond in effect for the operation <br />will continue in full force for the proposed period of renewal as well as any additional <br />bond required; <br />5. Any additional revised or updated information as required has been provided. <br />Based on a preponderance of the evidence, the permit issued to Seneca Property LLC meets the <br />requirements under the right of successive renewal. <br />The permit application will remain a binding part of the permit. Renewal of the permit will be for a <br />term of five (5) years. <br />I conclude that there is no basis for denying the renewal. <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Director Date <br />C -RN -15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.