My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-08_REPORT - M2012013
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2012013
>
2018-01-08_REPORT - M2012013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2021 12:16:01 PM
Creation date
1/8/2018 12:30:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012013
IBM Index Class Name
REPORT
Doc Date
1/8/2018
Doc Name
Annual Fee/Report/Map
From
Smithburg Family Partnership
To
DRMS
Annual Report Year
2017
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 12. 'Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres �� <br /> backfilled: seeded w/ w/topsol i mulched tiv% <br /> � <br /> approved mix: 14131 14, . icace : approved mulch: <br /> Total acres Total acres Topsoil i Mulch application <br /> graded: 1� 3� fertilized w/ replacement rate (ionslac}: ; <br /> aped fertilizer: depth(in.): j <br /> Seed Fertilizer Mulch <br /> application jx �1� " application application l <br /> method: u method: N A method: C �P J Sfl P�E <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YF�. NJ/�A <br /> If"YES", indicate the weed species,control area, control type, application rate and treatment date . <br /> 14. Is adequate topsoil reserved for reclamation, based on your approved permit'? YES NO N/A <br /> If"NO". please explain: <br /> 15. is the reserved topsoil vegctated-stabilized in accordance with Rule 3.1.9(1)'? YF,S NO N%A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of Tate <br /> Engineer(Well Permit, S.W.S.P.. andl'or Permanent Augmentation Plan)? YES NOS/' <br /> 17. Are all hazardous materials stored within approved spill containment structures." YES NO A <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation'! 1 S NO NIA <br /> 19. Is your basis for legal right to enter still valid'? UF NO <br /> 20. Does your permit require you to submit monitoring information annually? YI:S O N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation ,Act tier the Extraction of <br /> Construction Materials(C.R.S. 34-32-116 or 34-32.5-1 16).attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAI'ATTACHED: <br />
The URL can be used to link to this page
Your browser does not support the video tag.