Laserfiche WebLink
4) The Division found the application for RN -5 complete on September 9, 2017. Upon completeness <br />HGT is required to publish a Public Notice for four consecutive weeks which will initiate a 30 day <br />comment period from the date of the last publication. As of the date of this letter, the Division has yet <br />to receive a proof of publication of the public notice for RN -5. Please provide the Division a copy of <br />the public notice to ensure that the Public Notice was published as required. <br />Response: The last date of publication for the required Public Notice is 12/31/17. HGLO will provide an <br />affidavit of publication following the final date of publication. <br />5) During the MT -5 process, the Division generated a Reclamation Cost Estimate (RCE) for all <br />remaining permitted activities associated with the Hayden Gulch Loadout. Because this estimate was <br />generated during the 2015 cost updated year, the Division generated a RCE based on the 2017 cost <br />updated year. This RCE was presented to HGT and a subsequent Surety Reduction No. I application <br />was submitted. The RCE generated as a part of the SR -I will continue to serve as the site wide RCE <br />for the HG Loadout. <br />Response: No response necessary. <br />