Laserfiche WebLink
Name of Addressee <br />Page 8 <br />Date <br />iii. Pond Volume <br />iv. Primary outlet size of holes <br />b. Please submit an as built drawing of Pond F that includes a general plan and crossection <br />of the pond that includes relevant elevations for: <br />i. Top of structure <br />ii. Top of standpipe <br />iii. Dewatering holes <br />40. Please check Exhibit 8I against as built specifications and stage storage exhibits for all ponds and <br />update all values in Exhibit 8P where they differ from the as built design. <br />41. Fish Creek Borehole Treatment Facility and associated fish creek settling ponds were modified in <br />2006 and 2007. Please address the following: <br />a. Please inform DRMS if the above mentioned modifications changed anything on the <br />ground. <br />b. If the 2006 and 2007 modifications changed anything on the ground, please submit to <br />DRMS updated as built drawings. <br />42. Exhibit 8Q is referenced in the Table of Contents as: 8Q Pond T Certification. However it <br />provides important information regarding impoundment design specifications, hydrology and <br />soils, rather than Pond T as-builts. Please address the following: <br />a. Please update the table of contents to reflect a more accurate title for Exhibit 8Q, such as <br />for example: Impoundment Design Specifications, Hydrology and Soils <br />b. Please inform DRMS what exhibit addresses Pond T stage storage and as built <br />information. If there is no such exhibit, please provide stage storage information and as <br />built designs and cross-sections for Pond T. <br />43. For the Fish Creek Tipple Pond, DRMS was unable to locate as-builts and stage storage <br />information. Please inform DRMS what exhibit shows the cross section and stage storage <br />information for the Fish Creek Tipple Pond. If this information is not in the permit, please <br />provide cross section, as built and stage storage information for the Fish Creek Tipple. <br />44. The 6MN Mine Water Storage Reservoir design information (Exhibit 8CC) is not called out in <br />the Table of Contents. Also, DRMS was not able to locate cross section drawings of the <br />reservoir. Please address the following: <br />a. Please update the Table of Contents to include exhibit 8CC and submit the updated <br />document to DRMS. <br />b. Please either: <br />i. indicate where in the permit, cross-section drawings are located for the 6MN <br />reservoir or, <br />ii. submit cross-section drawings to DRMS. <br />c. Please inform DRMS if cross-section drawings exist for Area 1 Pit Temporary Water <br />Storage Basin; and if they exist where in the permit they are located. <br />d. If there are no cross-section drawings for Area 1 Pit currently in the permit please submit <br />drawings to DRMS. <br />