Laserfiche WebLink
December 14, 2017 <br />Horse Gulch Fill Quarterly Inspection Report <br />Fourth Quarter 2017 <br />Table of Contents <br />1.0 Introduction 2 <br />2.0 Critical Construction Periods 4 <br />2.1 <br />Removal of All Organic Material and Topsoil 4 <br />2.2 <br />Placement of Underdrainage Systems 4 <br />2.3 <br />Installation of Surface Drainage Systems 4 <br />2.4 <br />Placement and Compaction of Fill Materials 4 <br />2.5 <br />Revegetation 6 <br />3.0 References <br />I certify that this report was prepared by me. <br />Trapper Mining, Inc <br />1 <br />\\\l•S -7 4��/�w•�� <br />•z <br />Lo R /y�� <br />4;x$64 <br />l / <br />', 'ia� s& /2��// Z•vcca,,,�t�, <br />Tonia Marie Perkins <br />=,`�^"•. T' �v <br />• <br />CO PE 43864 <br />%, �f�t R•.•.••���:,`\. <br />Mining Engineer <br />rrirrirli `0� e``�`°� <br />Trapper Mining, Inc <br />1 <br />