My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-04_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2018-01-04_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 1:45:12 PM
Creation date
1/5/2018 6:45:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
1/4/2018
Doc Name
Adequacy Review
From
Robin Reilley
To
Brock Bowles
Type & Sequence
RN7
Email Name
RAR
DIH
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Horizon Permit Review RN7 Prepared by: R. Reilley Page 2 <br />Date: January 2018 Document Location: M\\Coal\rar\MidTermReviews <br />The following data comprises the years: <br />1951-1980 - Monthly precipitation <br />1999-2001: <br />o Precipitation Range in inches <br />o Relative Humidity <br />o Air temp <br />o Wind Direction <br />o Wind Speed <br />Given the site is in reclamation this aspect of the rules is adequately addressed in the <br />permit. <br />Rule: 2.05.3(4) Operation Plan <br />This is a review of the requirements for sediment pond construction, design and <br />maintenance and includes a review of the sediment pond as built designs, and <br />maintenance procedures. <br />DRMS finds that as the mine is in reclamation, ponds have been reclaimed or <br />retained with the exception of Ponds 7, 8, 9, 12 and 13 which are currently active <br />ponds. Section 2.05.3(3) and associated attachments of the permit address <br />descriptions, designs and plans for surface water structures adequately meeting the <br />requirements of rule 2.05.3. Recent completed permitting actions include Pond as <br />built designs and culvert additions while an in process action encompasses an <br />alternate sediment control demonstration (TR83). <br /> Adequacy <br />2. Until TR’s 83 and 77 are finalized this item remains open. <br />Rule: 2.05.4(2)(h) Reclamation Plans <br />The general requirements of this portion of the Reclamation Rule include: <br />A description of steps taken to comply with the Clean Air (42 U.S.C. Sec. 7401 et <br />seq.), and Clean Water (33 U.S.C. Sec. 1251 et seq.) acts and other applicable air <br />and water quality laws and regulations. <br />This item is adequately addressed in the permit. <br />Rule: 2.05.6(1) Mitigation of Impacts <br />Construction/Emissions permits approved in 2006 by CDPHE Air Pollution Control <br />Division are provided in Section 2.04.8-1 of the permit and adequately address <br />the requirements of this rule. The APCD air permit approval is up to date. <br />This item is adequately addressed in the permit. <br />2.05.6(4) Protection of Public Parks and Historical Resources
The URL can be used to link to this page
Your browser does not support the video tag.