Laserfiche WebLink
AREA 1, EXISTING UTILITIES <br />W_ - c �.. _.. _ _ .._....._, _. .... ....,_ <br />... sIV:.--------•........................................................................................ <br />uojouuuuluv UVU1 <br />• - <br />983 � - ........ ...................... <br />, <br />a n9833000017 <br />3000006 8330 ' <br />, <br />9 00005 <br />050 <br />SCALE IN FEET <br />, <br />a <br />AREA 21 EXISTING UTILITIES <br />LEGEND /NOTES <br />— RIGHT OF WAY <br />_ -- EXISTING FENCELINE <br />EDGE OF PAVEMENT <br />EXISTING EASEMENT <br />PROPERTY LINE <br />SOURCE: PLS, 2017 <br />PRE -MINING CONDITION MAP PREPARED BY ME OR UNDER MY <br />DIRECT SUPERVISION BASED ON A FIELD SURVEY AND MAPPING <br />PREPARED BY PLS GROUP,,LOVELAND COLORADO <br />5 6c <br />«r- <br />1 -34c S <br />CENTON J. BRUXVOORT, <br />COLORADO PE# 26325 <br />REVISIONS <br /># <br />UTILITIES <br />O <br />TYPES <br />OF STRUCTURES <br />- e — - EXISTING GASUNE <br />SUBMITTAL 1 <br />U1 <br />TELECOMMUNICATIONS STATION AND SILO <br />1 <br />RESIDENCE <br />EXISTING TELEPHONE LINE <br />12/22/17 <br />U2 <br />DITCH <br />2 <br />BUILDING, OUT BUILDING <br />-w w w w— EXISTING WATERLINE <br />READY -MIX <br />CONCRETE <br />U3 <br />WATERLINE <br />3 <br />GARAGE <br />onw in,: EXISTING OVERHEAD <br />POWERLINE <br />— IT IT IT IT IT .. EXISTING CULVERT <br />U4 <br />OVERHEAD POWERLINES <br />4 <br />BUSINESS BUILDING <br />U5 <br />TELECOMMUNICATIONS TOWER <br />5 <br />APARTMENT BUILDING <br />STRUCTURE <br />TO REMAIN <br />U6 <br />ROADS <br />6 <br />DITCH <br />--, STRUCTURE TO BE <br />-' REMOVED <br />U7 <br />DITCH <br />7 <br />POWER LINE <br />U8 <br />COMMUNICATION LINES <br />8 <br />WATER LINE <br />U9 <br />COMMUNICATION LINES <br />9 <br />FENCE <br />U10 <br />COMMUNICATION LINES <br />10 <br />ROAD <br />U11 <br />GAS LINES AND ELECTRICAL LINE <br />11 <br />OTHER <br />U12 <br />WATERLINE <br />12 <br />GAS LINE <br />U13 <br />WATERLINE <br />13 <br />TELECOMMUNICATIONS <br />PRE -MINING CONDITION MAP PREPARED BY ME OR UNDER MY <br />DIRECT SUPERVISION BASED ON A FIELD SURVEY AND MAPPING <br />PREPARED BY PLS GROUP,,LOVELAND COLORADO <br />5 6c <br />«r- <br />1 -34c S <br />CENTON J. BRUXVOORT, <br />COLORADO PE# 26325 <br />REVISIONS <br /># <br />DESCRIPTION <br />O <br />TASK NUMBER <br />PQQ <br />QO <br />SUBMITTAL 1 <br />9/1/2017 <br />ST <br />WLN <br />1 <br />DRMS SUBMITTAL 2 <br />12/22/17 <br />ST <br />WN <br />LORLAND <br />READY -MIX <br />CONCRETE <br />DATE <br />12/22/17 <br />PROJECT <br />360100 <br />TASK NUMBER <br />003-04 <br />DRAWN BY <br />ST <br />PROJECT <br />ENGINEER <br />WLN <br />CHECKED BY <br />KJB <br />PREPARED FOR: <br />a <br />LOVELAND READY -MIX <br />EXHIBIT C <br />PRE -MINING <br />CR 54G UTILITY <br />ASSET CALLOUTS <br />SHEET NUMBER: <br />REVISION NUMBER: <br />2 <br />z <br />PREPARED BY.• <br />TELESTO <br />S O L U T 1 O N S• I N C O R P O R A T E D <br />PREPARED FOR: <br />a <br />LORLAND <br />READY -MIX <br />CONCRETE <br />x <br />