Laserfiche WebLink
v o <br /> CM <br /> p oso �� <br /> Mo Z <br /> A <br /> C� C� o ? 0 <br /> H SD0) <br /> m -D -1D 0 � <br /> N H <br /> � G <br /> v � � <br /> T � <br /> O IN <br /> 7 Uj <br /> v n o <br /> o <br /> 3 � o <br /> in m O <br /> M A <br /> C 3 <br /> O <br /> 8 C E F C <br /> 1 Knox Laporte CO <br /> 2 <br /> 4 Productivity for front End Loader 12/29/2017 3 0 C) <br /> 5 Assume VONO L 150 C Loader PE NCE ACTORS � m <br /> 5 Bucket Capacity 5 Cubic Yard Net Loader Heaped Bucket <br /> 7 I Loose/Stockoe Bucket Cycle Task Bucket Fill work <br /> 8 Task Oescnpbon Location 1 Location 2 Epuipment Volume Capacity Time Productivity Time Capacity Factor Hour Q <br /> G <br /> 9 Icy) (cY) (min) (grtlr) (hours) (cy) (minRir) co� <br /> 10 Load NaulTrueKs <br /> 11 Load Phase I Fines.08.and Topsoil Stockpile I Phase I pit Volvo 150C 177,098 4.4 0.65 370 478 5.0 0.875 55 <br /> 12 Load Phase II Fines OB,and Topsoil Stockpile 11 Phase II pit Volvo 150C 230.415 4.4 0.65 370 622 5-0 0.875 55 Z W <br /> 13 Load Phase III Fines.08,and Topsoil Stockpile 81 Phase III pit Volvo 150C 191,629 4.4 0.65 370 518 5.0 0.875 55 v <br /> 14 Load Phase Iv Fines.08.and Topsoil Stockpile IV Phase N pit Volvo 150C 165,598 4.4 0.65 370 447 5.0 0.875 55 <br /> � <br /> 15 Load Phase v Fines.08,and Topsoil Stockpile V Phase V pit Volvo 150C 151.210 4.4 0.55 370 408 5.0 0.875 55 O <br /> r 1 Sum By Phase 2 Material 3 Earthwork 4 Dozer 5 Grading 6 Trucks 7 Loader 8 EarthSum 9 Revegetation 10a Other <br /> (D <br /> rD <br /> N <br /> CD O <br /> O <br /> � V � <br /> � I N <br /> v C7l <br />