My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-03_PERMIT FILE - M2017036 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017036
>
2018-01-03_PERMIT FILE - M2017036 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2021 2:47:38 AM
Creation date
1/4/2018 12:32:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017036
IBM Index Class Name
Permit File
Doc Date
1/3/2018
Doc Name
Adequacy Review Response
From
Loveland Ready-Mix Concrete
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job No: 360100-004-04 Client: LRM Page 7 of 26 <br /> TELEST ® Task: Recl'n Cost Estimate Computed By:D.Bauer Date: 9/7/17 <br /> a O L UT 10 N3• 1 11 r t v v () H 1. T E U <br /> . . . . DRAFT-For DRMS Review Checked By: W.Niccoli Date: 12/30/17 <br /> Calculations Con'd: <br /> 4. Quantify hauling operations <br /> Loader��111, <br /> Loa d e r'l.�111,E25/H25)) <br /> =P29*L15�` 7 Loader'��11*cti5/�i5 <br /> A P>sect ovu how fast tkeooader LEads\FGH <br /> 1 Knox Pit Laporte C0 <br /> 2 <br /> 4 ProductNkysndFbwsRepuis0lbrTruckUse FrovK opti,vv_ zat12/29/201? <br /> Assume CASE 325 Maculated Mine Haul truck6 Payload Capacity 17A CubicYard(heaped) EstCv e <br /> Loose <br /> Overburden 8 <br /> 11 FinesStockplle Cycle No of Task Slruck Heaped <br /> 12 Task.Description Location 1 Location 2 Equipment Volume Time Trucks *mductiNt! Time Capacity Capacity <br /> 12 Icy) (min) (cyelr) (hrs) (cy) (Cy) <br /> 14 Haul fines 6 Overburden backfill <br /> 15 Haul Fines.08 and Topsoil a Stockpile I Phase I pit Case 325 177,098 4.3 2 335 529 14.0 17.4 <br /> 16 Haul Fines.08.and Topsoil Stockpile II Phase 0 pit Case 325 230,415 4.5 2 320 720 14.0 17.4 <br /> 17 Haul Fines,08 and Topsoil Stockpile III Phase III pit Case 325 191,629 61 3 353 543 14.0 17.4 <br /> 18 Haul Fines OB.and Topsoil Stockpile IV Phase IV pit Case 325 165,598 46 2 314 527 14.0 17.4 <br /> 19 Haul Fines 08 and Topsoil Stockpile V Phase V pia Case 325 151,210 4.6 2 314 481 14.0 174 <br /> 20 <br /> 21 <br /> 22 <br /> 23 Haul Haul Haul Return Return Return <br /> 24 Effective Ellecthre McM Effective Elfective ElfecBve <br /> 2° Task Description Location 1 Location 2 Equipment Grade Grade Grade Grade Grade Grade Haul <br /> 26 Segment 1 Segment 2 Segment 3 Segment 1 Segment 2 Segment 3 Time <br /> 27 (%) (%) M (%) (%) M (min) <br /> 28 Haul fines 6 Overburden backfifl <br /> 29 Haul Fines 08.and Topsoil Stockpile I Phase I pit Case 325 3% 3% 3% 2% 3% 2% 0.3 <br /> 30 Haul Fines OB.and Topsoil Stockpile II Phase 11 pit Case 325 3% 3% 3% 2% 3% 2% 0.5 <br /> 31 Haul Fines OB and Topsoil Stockpile III Phase lli pit Case 325 3% 3% 3% 2% 3% 2% 1.4 <br /> 32 Haul Fines OB and Topsoil Stockpile IV Phase IV pit Case 325 3% 3% 3% 2% 3% 2% 0.5 <br /> 33 Haul Fines OB and Topsoil Stockpile V Phase V pit Case 325 3% 3% 3% 2% 3% 2% 05 <br /> 34 <br /> 1 Sum By Phase 2 Material 3 Earthwork 4 Dozer 5 Grading 6 Trucks 7 Lo er 8 EarthSum 9 Revegetatwr <br /> FrovK Mvle PLavi, <br />
The URL can be used to link to this page
Your browser does not support the video tag.