Laserfiche WebLink
Knox Pit, Laporte CO <br /> 12/29/2017 <br /> Loveland Ready-Mix <br /> Earthwork, revegetation and final grading Summary Knox pit reclamation costs <br /> Using Motorgraders to spread dumped backfill, Sheeps Foot rollers to compact <br /> Phase I Phase II Phase 111 Phase I V Phase V <br /> Current Value Current Value Current Value Current Value Current Value <br /> DIRECT COSTS Earthmoving (including 6" topsoil) $318,627 $430,650 $422,137 $317,479 $289,683 <br /> Revegetation (tilling, drill seeding, and mulching topsc $11,400 $13,200 $11,400 $9,000 $31,800 <br /> Pit Pumpdown $ 3,104 $ 3,257 $ 2,875 $ 1,872 $ 1,726 <br /> Perimeter Drain $ 22,541 $ 36,359 $ 32,165 $ 27,602 $ 58,175 <br /> Reclamation Grading $28,051 $28,051 $28,051 $28,051 $28,051 <br /> Subtotal, Direct Costs $383,724 $511,518 $496,628 $384,005 $409,436 <br /> INDIRECT COSTS Mobilization and Demobilization 1.0% $3,837 $5,115 $4,966 $3,840 $4,094 <br /> Contingencies 10.0% $38,372 $51,152 $49,663 $38,400 $40,944 <br /> Engineering Redesign Fee 2.5% $9,593 $12,788 $12,416 $9,600 $10,236 <br /> Contractor Profit and Overhead 12.0% $46,047 $61,382 $59,595 $46,081 $49,132 <br /> Project Management Fee 2.0% $7,674 $10,230 $9,933 $7,680 $8,189 <br /> State Procurement Cost 0.0% $0 $0 $0 $0 $0 <br /> Indirect Percentage Sum =1 27.5% <br /> Subtotal, Indirect Costs $105,524 $140,667 $136,573 $105,601 $112,595 <br /> TOTAL COST $489,248 $652,186 $633,200 $489,606 $522,030 <br />