Laserfiche WebLink
To: Jared Ebert <br /> Date: December 29. 2017 <br /> Page 26 <br /> Response to Comments 46 g <br /> See Attachment 6. Note there was a conversion error in the original calculation of the <br /> pumping costs provided in Appendix L. <br /> Response to Comments 46 h <br /> Overburden averages approximately 4.1 feet over the entire site. We have assumed three <br /> feet of the overburden would be used as cover material, with the top six inches being <br /> topsoil. Three feet results in an estimated 456,335 cy(loose) of material. The additional <br /> 1.1 feet is assumed to be used in compacted liner and general backfill. These quantities <br /> can be found by summing column L in Attachment 6. <br /> Response to Comments 46 i <br /> Vegetation costs are lumped into a per-acre revegetation cost as shown in Attachment 5, <br /> page 10. Seed costs were quoted at roughly $175/acre. Total plantings of shrubs and <br /> trees for the landscaping plan required by the county is approximately $5,000. All of <br /> these plantings will be in place prior to mining, so these costs have not been included in <br /> the reclaimed vegetation costs. <br /> Response to DBMS comments T E L E S T <br />