Laserfiche WebLink
SE Samuel Engineering <br /> We Provide Solutions <br /> 16286 CC&V High Grade Mill Concentrate Shipping- Detailed UG Relocation <br /> Project Number: 16286-02 <br /> Project DCN: PM-103 <br /> Drawing List Status Report (16286-DL-TECH-001) <br /> Date: 6/9/2017 <br /> Drawing No. Drawing Owner Discipline Rev.No. Document Title Issued Date Revision Description <br /> (Status) <br /> 20-647-84 Samuel Engineering Mechanical C General Arrangement-High Grade Mill Plot Plan Option A 1/18/2017 Issued for Permit <br /> 30-647-19 Samuel Engineering Civil 0 Site Plan,Access Road Profile,Grading Section,and Control Point Table 6/8/2017 Issued for Construction <br /> 30-647-22 Samuel Engineering Piping 1 Buried Utility Realignment-Plan 6/6/2017 Issued for Construction <br /> 30-647-23 Samuel Engineering Piping 1 Buried Utility Realignment-Sections and Details-Sheet 1 6/6/2017 Issued for Construction <br /> 30-647-24 Samuel Engineering Piping 1 Buried Utility Realignment-Sections and Details-Sheet 2 6/6/2017 Issued for Construction <br /> 80-647-008 FLSmidth Electrical 2 Single Line Diagram MCC-16 2/2/2016 As-built <br /> 80-647-627 Samuel Engineering Electrical 1 Concentrate Recovery Loadout Demo,UG and Tray Plan 6/8/2017 Issued for Construction <br /> 80-647-628 Samuel Engineering Electrical 1 Concentrate Recovery Loadout Demo,UG and Tray Plan 6/8/2017 Issued for Construction <br /> Total No.of Dwgs.: 8 <br /> Page 1 of 1 <br />