Laserfiche WebLink
Newn,ont-tipple Creek&Victor Gold Mine <br /> Technical Specification No 02200- Earthworks <br /> ' Concentrate Shipping ■ <br /> Project No 475 0106.015 <br /> June 21,2017 <br /> ' content is reduced to an amount suitable for obtaining the specified degree of <br /> compaction, at no cost to CC&V. <br /> ' 9. After each layer of fill material has been placed, spread, and moisture-conditioned, <br /> the layer shall be compacted by passing compaction equipment over the entire <br /> ' surface of the layer a sufficient number of times to obtain the required density, as <br /> specified herein. Compaction shall be accomplished with equipment and by <br /> methods approved by CERTIFYING ENGINEER. If such equipment or methods are <br /> ' found unsatisfactory for the intended use, the CONTRACTOR shall replace the <br /> unsatisfactory equipment with other types or adjust methods until proper <br /> compaction is achieved. Prior to placement of a subsequent lift, the previous lift <br /> ' shall be thoroughly scarified to a nominal depth of 2-inches to provide good <br /> bonding between lifts. Scarification shall be accomplished by disking, raking with a <br /> grader, or an alternative method approved by the CERTIFYING ENGINEER. <br /> ' 10. The CQA Monitor will measure the ambient air temperature on an hourly basis. If <br /> the ambient air temperature is less than thirty-two degrees Fahrenheit for more <br /> than one hour over the preceding twenty-four (24) hours, the CQA Monitor will <br /> tmeasure the temperature of the fill to determine if the fill is frozen. "Frozen" is <br /> defined as a mean temperature of thirty-two degrees Fahrenheit (32°F) or less. The <br /> ' CQA Monitor will measure the temperature at a depth of three (3) inches and six <br /> (6) inches, recording the lower of the two measurements. Six(6) measurements will <br /> be taken per acre, and if the average is below thirty-two degrees Fahrenheit (320F), <br /> ' the fill will be considered frozen. If the fill is determined to be frozen the <br /> CONTRACTOR may either remove and replace the frozen fill or wait until <br /> subsequent temperature monitoring indicates the fill is unfrozen at no cost to <br /> ' CC&V. <br /> B. Select Structural Fill <br /> ' 1. Select Structural Fill shall be placed for site grading as required by the OWNER and <br /> CERTIFYING ENGINEER. <br /> 2. CONTRACTOR shall condition Select Structural Fill to a moisture content that allows <br /> ' compaction to the required density and that results in a firm, unyielding surface <br /> capable of allowing the movement of vehicles and equipment over the surface <br /> without causing rutting or other deleterious effects. <br /> ' 3. CONTRACTOR shall place Select Structural Fill materials with less than 30 percent <br /> rock materials above 3/4-inch size in maximum 12-inch loose lifts, and compacted <br /> ' to 95 percent of maximum dry density and within 2% of the optimum moisture <br /> content as defined by ASTM D1557 (modified proctor). <br /> 4. CONTRACTOR shall condition and place Select Structural Fill containing more than <br /> ' 30 percent rock materials above 3/4-inch size (rock fill) in maximum 12-inch loose <br /> lifts and compact by a method compaction technique approved by the CERTIFYING <br /> 1 <br /> Page 6 <br />