Laserfiche WebLink
of at the Trapper Mine with an average of 1,222 tons per day expected. This is equivalent to an <br />average annual volume of waste of about 231 acre-feet, after compaction. The applicant expects <br />this waste burial process will continue for the life of the mine. Down -gradient ground water <br />monitoring wells are in place to detect any potential degradation of the ground water due to <br />leachate through the ash waste pile. <br />12 <br />