My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-03_REVISION - M2000041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000041
>
2018-01-03_REVISION - M2000041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:42 PM
Creation date
1/3/2018 2:15:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
REVISION
Doc Date
1/3/2018
Doc Name
Request for Technical Revision
From
Fremont Paving
To
DRMS
Type & Sequence
TR5
Email Name
ERR
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_�& FREMONT PAVING and REDI=MIX, INC. <br /> 839 MacKenzie Avenue Telephone: <br /> P. O. Box 841 (Bus.) 719 - 275-3264 <br /> Canon City, Colorado 81215 (Fax) 719 - 275-8897 <br /> December 18, 2017 <br /> Mr. Elliott Russell <br /> Environmental Protection Specialist <br /> Colorado Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> RE: Technical Revision for Pueblo East Pit, M-2000-041 <br /> Mr. Russell, <br /> Fremont Paving and Redi Mix, Inc. is requesting a Technical Revision to the above referenced pit. <br /> Fremont would like to begin importing clean dirt, construction waste and aged concrete to be placed in <br /> the mine out sections of the pit for backfill material. <br /> It is difficult to anticipate the volume of inert material to be backfilled, however,the total yearly amount <br /> would not exceed 100,000 cubic yards per year. A majority of this material will be imported clean dirt. <br /> We would begin this process as soon as the Technical Revision has been approved and would continue <br /> through reclamation. This material will be compatible with our post-mining land use and will be used to <br /> help reclaim the area above the prevailing groundwater elevation. The material will be placed in 10-foot <br /> lifts using equipment to compact the material. <br /> There will be no additional cost to import this material to the site, as we will use a back-haul method <br /> from a sister facility to transport. In fact,the utilization of such backfill material will help to alleviate any <br /> issues with a limited supply of material on site to use for reclamation. <br /> We will send an affidavit certifying the material is clean and inert once the Technical Revision has been <br /> approved, but prior to importation. <br /> Sincerely, <br /> J Schreiber <br /> ief of Operations <br /> 719-275-3264 <br /> 719-429-9001 <br /> jodi@arycorp.com <br /> ASPHALT CONCRETE SAND & GRAVEL <br /> Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.