Laserfiche WebLink
__JW All Rite Paving & Redi Mix, Inc. <br /> Lamar Division <br /> 200 Speculator P.O. Box 165 <br /> Lamar, Colorado 81052 Canon City, Colorado 81215 <br /> 719-336-2451 719-275-1280 <br /> Fax: 719-336-2596 <br /> December 18,2017 <br /> Mr. Elliott Russell <br /> Environmental Protection Specialist <br /> Colorado Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> RE: Technical Revision for Speculator Pit, M-1987-079 <br /> Mr. Russell, <br /> Fremont Paving and Redi Mix, Inc. is requesting a Technical Revision to the above referenced pit. <br /> Fremont would like to begin importing clean dirt, construction waste and aged concrete to be placed in <br /> the mine out sections of the pit for backfill material. <br /> It is difficult to anticipate the volume of inert material to be backfilled, however,the total yearly amount <br /> would not exceed 50,000 cubic yards per year. A majority of this material will be imported clean dirt. <br /> We would begin this process as soon as the Technical Revision has been approved and would continue <br /> through reclamation. This material will be compatible with our post-mining land use and will be used to <br /> help reclaim the area above the prevailing groundwater elevation. The material will be placed in 10-foot <br /> lifts using equipment to compact the material. <br /> There will be no additional cost to import this material to the site, as we will use a back-haul method <br /> from a sister facility to transport. In fact,the utilization of such backfill material will help to alleviate any <br /> issues with a limited supply of material on site to use for reclamation. <br /> We will send an affidavit certifying the material is clean and inert once the Technical Revision has been <br /> approved, but prior to importation. <br /> Sincerely, <br /> iSchreiber <br /> `Chief of Operations <br /> 719-275-3264 <br /> 719-429-9001 <br /> jodi@arycorp.com <br />