My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-12-21_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2017-12-21_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2018 7:50:14 AM
Creation date
1/3/2018 6:57:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
12/21/2017
Doc Name
Comment
From
Judith Martin
To
DRMS
Type & Sequence
RN7
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G <br />r <br />§2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING <br />ACTIVITIES - MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION <br />PLANS. <br />TR -020 <br />a pole shed constructed on a concrete stab, sheathed <br />with steel siding and steel roof. <br />12. Train loadout substation <br />This substation, primary voltage 46 W, is used to <br />supply power to the elevating conveyors, bag houses, <br />vibratory feeders, lighting and hydraulics needed to <br />operate the truck dump, silo and train Ioadout facilities. <br />It is fenced with chain link and measures approximately <br />50 feet wide by 70 feet long and 10 feet high. It <br />contains switchgear and transformers mounted on <br />concrete pads. <br />13. MCC Buildings (4) <br />1. The MCC building located just southwest of the <br />shop area controls motors for the train Ioadout <br />elevating conveyor. It is masonry in <br />construction with a metal roof and a poured <br />concrete slab floor/foundation. This MCC is <br />approximately 30 feet long by 20 feet wide and <br />10 feet tall. <br />2. The MCC building located immediately to the <br />north of the train Ioadout controls the electrical <br />system of the Ioadout. It is masonry in <br />construction with a metal roof and a poured <br />concrete slab floor/foundation. This MCC is <br />approximately 32 feet long by 24 feet wide and <br />10 feet tali. <br />3. The MCC building located adjacent to the <br />western most silo controls the bag houses, <br />feeders and hoist systems of the silo system. <br />It is masonry in construction with a metal roof <br />2.05-10 3101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.