Laserfiche WebLink
w <br /> COLORADO <br /> Division of Reclamation, <br /> Mining and Safety RECEIVED <br /> Department cf Natural Resources ++ ((�� <br /> 1313 Sherman Street, Room 215 N d Z N S <br /> Denver, CO 80203 <br /> i ���IIYIY <br /> November 29, 2017 <br /> Stephanie Fancher-English <br /> Loveland Ready-Mix Concrete, Inc. <br /> 664 N.Namaqua Road, <br /> Loveland, Colorado 80539 <br /> RE: Knox Pit,DRMS Permit Application No. M-2017-036 <br /> Adequacy Review No. 2 <br /> Dear Mrs. Fancher-English: <br /> The Colorado Division of Reclamation, Mining and Safety(Division or DRMS)conducted an inspection <br /> of the proposed mining site on November 22, 2017. Based on this inspection,the Division identified <br /> several additional adequacy review items that will need to be addressed. These items are in addition to <br /> the items already identified in the Division's first adequacy review letter dated November 14,2017. <br /> During the inspection,the Division observed the Taylor and Gill Ditch. A portion of this ditch appears to <br /> be located within the permit area along the western boundary of the mine site south of the Little Cache La <br /> Poudre Ditch. A small ditch lateral appears to T-off the Little Cache La Poudre ditch and flows parallel <br /> to the Taylor and Gill Ditch and bends to the east into the site. This lateral ditch appears to dead end near <br /> the dirt road that goes to the Little Cache La Poudre ditch from the southwest entrance to the mine site. <br /> The Taylor and Gill ditch and the lateral are not identified on Exhibit C or discussed in Exhibit S. Given <br /> this,please address the following issues: <br /> Rule 6.4.3 Exhibit C—Pre-Mining and Mining Plan Map(s) of Affected Lands <br /> 1. Please update the Exhibit C maps to depict the Taylor and Gill Ditch and the Little Cache La <br /> Poudre lateral ditch. Please show the name of the owner of the ditch and lateral. <br /> Rule 6.4.4—Exhibit D Mining Plan and Rule 6.4.5,Exhibit E—Reclamation Plan <br /> 2. The mining plan and reclamation plan does not appear to take into account the location of the <br /> Taylor and Gill Ditch and the lateral ditch. Please revise the mining and reclamation plan as <br /> necessary to account for these structures. Please indicate how these structure will be protected <br /> from damage during the mining operation. <br /> 3. The Taylor and Gill ditch and the lateral ditch do not appear to be lined. Please explain how <br /> water losses from the ditches will be prevented,monitored and/or mitigated. <br /> of o <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br /> John W. Hickenlooper, Governor I Robert Randall, Executive Director I Virginia Brannon, Director '%' <br /> � 1876; <br />