My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-12-29_PERMIT FILE - P2016020
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2016020
>
2017-12-29_PERMIT FILE - P2016020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 4:59:09 PM
Creation date
1/2/2018 12:04:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2016020
IBM Index Class Name
Permit File
Doc Date
12/29/2017
Doc Name
Abandonment Report
From
Dean Misantoni
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dean Misantoni CPG#11276 ######### <br /> Drill Pad 1 <br /> Hole# N W Date Completed Total Depth Stratigraphy Cored Abandonment Method Notes H20? <br /> 1 MW16-001 39"16'14.71"N 106'8'55.64"W Oct-16 929' PQ Qls,Paleozoic sedimentary rocks Abantonite from TD to collar vertical hole at one time artesian f <br /> and porphyry sills not during abandonm <br /> Drill Pad 2 <br /> Hole# <br /> 2 MW16-002 39'16'19.59"N 106'8'57.16"W Oct-16 1058.5' PQ Qls,Paleozoic sedimentary rocks Abantonite from collar to 420' vertical hole at one trine artesian f <br /> and porphyry silk and 1/4 gravel 420'to TD 1058.5' not during abandonm <br /> 3 MW16-003 39°16'19.59"N 106'8'57.16"W Ott-16 661' PQ Qls,Paleozoic sedimentary rocks Abantonite from TD to collar N30W,-55 at one time artesian f <br /> same collar location for MW 16-002 and 003 (only Pennsylvanina Belden Shale and not during abandonm <br /> porphyry sills) <br /> all core holes were reamed or cleaned out to total depth by Godbe prior to grouting by utilizing H sized core inside the PQ core holes drilled by Titan- <br /> all phases of the abandonment process were observed by Dean Misantoni,CPG and London Mine GM Godbe moblilzed to the site 12/3/17 and finished Drilling and demobilized 12/17/17 <br /> numerous pictures,daily reports can be provided documenting,that the abondonment process was carried as approved. Godbe Drilling has been paid$43,500 for their services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.