Laserfiche WebLink
December 14, 2017 <br />Horse Gulch Fill Quarterly Inspection Report <br />Fourth Quarter 2017 <br />Table of Contents <br />1.0 Introduction 2 <br />2.0 Critical Construction Periods 4 <br />2.1 Removal of All Organic Material and Topsoil 4 <br />2.2 Placement of Underdrainage Systems 4 <br />2.3 Installation of Surface Drainage Systems 4 <br />2.4 Placement and Compaction of Fill Materials 4 <br />2.5 Revegetation 6 <br />3.0 References 6 <br />I certify that this report was prepared by me. <br />Trapper Mining, Inc. <br />0\\ \I It! t I !!III,//z <br />• y <br />" <br />-p 4:.':864 <br />cc <br />Tonia Marie Perkins <br />CO PE 43864 <br />''LW A <br />Mining Engineer <br />Trapper Mining, Inc. <br />