Laserfiche WebLink
material returned to the pit will be in excess of 50 percent of the total volume <br /> mined. <br /> Next, the overburden salvaged during the stripping operation will be <br /> returned to the slopes and new floor area. On the slopes,this material will be left <br /> in a fairly rough condition during redeposition to allow the following layer of <br /> topsoil to "bind" to the underlying materials. On the floor areas the overburden <br /> material will be smoothed to some extent as it may become the plant growth <br /> medium at a later stage of the reclamation process. <br /> 16 Revised October 2017 <br />