Laserfiche WebLink
Fugitive dust is expected from two sources: over the road truck traffic haul roads <br /> and mining equipment haul roads. Water will be sprayed onto the haul roads to <br /> control dust, as needed. For the over the road haul truck a 15 miles per hour speed <br /> limit is posted and enforced. If available, recycled asphalt pavement (RAP) will be <br /> placed on the over the road haul truck haul road to minimize dust. <br /> Mining Timetable. The uncertainty of current economic conditions in the <br /> construction industry precludes accurate forecasts of mining activity over the life <br /> of the mine. Therefore, the operator has elected to estimate a mining timetable <br /> based on an average year and expects a specific year to vary widely from the <br /> average. <br /> 13 Revised October 2017 <br />