Laserfiche WebLink
Generally, the • est one half f the pfe„eft-yStage 2 will be mined ffeffl the <br /> finishing in Stages 2 &-6 along the entire strike length to average any material <br /> differences from different elevations of the mine. The east one half ofthe <br /> pfopeft-yStage 4 will be mined from the north to the south. The south half of stage <br /> 4 is currently covered by claystockpile storage area, , <br /> Stages i & 3 have boor <br /> fni-ned <br /> 11 Revised October 2017 <br />