Laserfiche WebLink
��OF cotes? <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SA <br /> * � * 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 b ej) <br /> F lg76 x <br /> 8 2 <br /> RE UEST FOR TECHNICAL REVISION TR COVER SHEET -"A <br /> DIVISION OF RECI. <br /> 198 026 Challenger Pit MININCANDS,�F TION <br /> File No.: M- Site Name: <br /> County Weld TR# (DRMS Use only) <br /> Permittee:Coulson Excavating Compc <br /> M-1985-026 - Tn06 <br /> Operator(If Other than Permittee): Complied! <br /> NO Violations <br /> Permittee Representative: <br /> Ken Coulson ECS, WHE <br /> Please provide a brief description of the proposed revision: <br /> Update reclamation plan to show a residential structure and docks on the main pond and <br /> final grading. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 Fv� <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 <br />