Laserfiche WebLink
certified weed-free. <br /> 43. Reclamation will be monitored by the operator,USFS personnel, and State of Colorado <br /> (DRMS) inspectors on an as needed basis. <br /> 44. All non-system access roads will be ripped,re-contoured,graded, and seeded at the end of <br /> operations. <br /> 45. The road and site will be seeded with USES-approved seed mixtures,as needed. <br /> 01D 46. Re-vegetation will not be complete until at least 5 /o plant re-growth has been <br /> established;when compared to adjacent undisturbed areas, <br /> 47. Top soil must be saved and used to cover all disturbed areas. <br /> 48.Return large rocks, boulders,and logs to their original (general)position, <br /> 49. The U.S. Forest Service may require additional reclamation measures if needed. <br /> 50. Remove all trash off of Forest Service Lands. <br /> 5 1.Remove all structures(fences,signs)from Forest Service Lands, <br /> 52. Complete all reclamation within one year of the end of the operating plan. <br /> 53.Refund of any reclamation bond is contingent upon the success of reclamation. <br /> MOMTORING <br /> The Forest Service will monitor and assess the progress of reclamation activities, <br /> including re-vegetation and erosion control, for a minimum of three years. Dependent <br /> on the success of the second phase of reclamation, additional seeding, weed treatment, <br /> or installation of erosion control structures may occur. <br /> TREFOLL0 WING STANDARD TERMS-r4ND CONDITIONS ARE TAKEN FROM <br /> FOREST SERVICE FORM FS 2800-5 AND ARE REOLLIRED FOR THIS PL4N OF <br /> OPERATIONS: <br /> • Information provided within this plan that is marked confidential will be treated in <br /> accordance with the agency's laws,rules, and regulations. <br /> • Approval of this plan does not relieve me of my responsibility to comply with other <br /> applicable state.or federal laws,rules, or regulations. <br /> • Approval of this,plan does not constitute recognition or certification of ownership to any <br /> person named as owner herein. <br /> • Approval of this operating plan does not constitute,now or in the future,recognition or <br /> certification of the validity of any mining claim to which it may relate or to the mineral <br /> character of the land on which it lies. <br /> ............... <br />