Laserfiche WebLink
Activity Feet Cost <br /> Wildlife closure fence required at end of mine life' 40,375 $775,200.00 <br /> Wildlife closure fence built during operations' 6,247 $119,942.40 <br /> Total wildlife closure fence to build at end of mine life' 34,128 $655,257.60 <br /> Removal of 8ft wildlife fence installed during mine o erations2 9,293.81 $ 27,044.99 <br /> Removal of 4 strand barbed wire fence installed during mine o s2 42,785 $ 57,759.75 <br /> Removal of 6 ft chain link fence installed during mine operations2 5,973 $ 97,539.09 <br /> Removal wildlife escape structures3 $ 4,046.32 <br /> Total cost $841,647.75 <br /> 15%contingency $967,894.91 <br /> Bond update amount $195,904.91 <br /> 'Price per foot installation of 811 woven wire from Taylor Fence quote=$19.2 <br /> 'Price per foot installation of 8ft woven wire from Taylor Fence quote=$19 2 <br /> 'Price per foot installation of 8ft woven wire from Taylor Fence quote=$19.2 <br /> ZPrice per removal of 8 ft.woven wire from RS Means=$2.91/LF <br /> ZPrice per removal of 5 strand-barbed wire from RS Means=$2.07/LF(024113601650,Fencing demolition,removed barbed wire,5 strands) <br /> ZPrice per removal of 6 ft.chain link fence from RS Means=$16.33/LF(0241 1 36205 10,Selective demolition,chain link fences&gates) <br /> 3Price calculated RS Means"Selective demolition,retaining walls,stone filled gabions"and"ripping trap rock,medium hard,ideal conditions" <br /> Table 6. Calculation of bond surplus. <br /> Bond held by DRMS $207,991,188 <br /> Pre TR-95 bond $207,607,502 <br /> Bond amount post-TR95 $207,609,023 <br /> Bond amount post-TR91 $207,804,928 <br /> Bond surplus $186,260 <br /> 10 <br />