Laserfiche WebLink
Q0 <br /> NEWMONT P cwwont Mating t,orpr.rauu,i <br /> .� ��I�C;eel S Viru; F�.!d P.9uuiy Cinipdny <br /> t N, c, <br /> P G F-, 51 <br /> Victor,CO S0860 <br /> corn <br /> REEENFEA <br /> SENT CERTIFIED RETURN RECEIPT REQUESTED <br /> 7017 1450 0000 9199 0287 DEC 212017 <br /> December 19, 2017 <br /> DIVIMIN NG ANo SAFETY <br /> Mr.Tim Cazier,P.E. <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources <br /> Division of Reclamation,Mining and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street,Room 215 <br /> Denver, CO 80203 <br /> Re: Permit No. M-1980-244• Cripple Creek & Victor Gold Mining Company ("CC&V"); <br /> Cresson Project-, — Wildlife Protection — Conditional Approval Item #40 — Technical <br /> Revision#91 Adequacy Review Response <br /> Dear Mr. Cazier: <br /> The Cripple Creek&Victor Gold Mining Company(CC&V) is in receipt of the Division of Reclamation <br /> Mining and Safety(DRMS) letter dated September 29,2017 regarding its adequacy review comments for <br /> Technical Revision(TR) 91. After a CC&V field visit and wildlife discussion on October 25th, 2017 <br /> between members of Colorado Parks and Wildlife(CPW), CC&V, and DRMS,a new proposal of fence <br /> location and wildlife risk mitigation is provided in this document. DRMS comments are listed below in <br /> italics followed by CC&V's response to in bold. Documentation required to support our responses is <br /> provided in the attachments. <br /> 1. The proposed schedule for wildlife fence installation segments includes a Proposed Installation <br /> column. Please revise this table to include two additional columns:Proposed Commencement <br /> and Proposed Completion. <br /> Table 2,the proposed schedule for wildlife fence installation, has been updated per DRMS' <br /> comment and per discussion with DRMS and CPW on October 25th,2017. Please note these <br /> are estimated timeframes that may change subject to weather and contractor availability. <br /> Additionally,the following changes have been made: <br /> - Updates to Figure 4 have been made to reflect Table 2 and are provided in Attachment <br /> 1 below. <br /> - CC&V no longer proposes the installation of deer guards as they are not necessary for <br /> the proposed fence configuration. <br /> 1 <br />