Laserfiche WebLink
and original water will be obtained from either the Columbia Ditch or the Point of Diversion <br /> pump in the South Platte River. <br /> All water on-site will be recycled; placer gold operations are net water consumers due to <br /> evaporation. This contributes to the fact that there is no discharge from the site. Water is first <br /> discharged from the plant into Pond 1 with overflow into Pond 2 and eventual flow into Ponds 3 <br /> and 4 before repumping into the plant to be used again in gold separation operations. <br /> Alma Placer Mine (.ft%r..wki and N1,,(' <br /> December 2017 G-4 <br />