My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-12-20_REPORT - M1982155
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1982155
>
2017-12-20_REPORT - M1982155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 11:28:57 PM
Creation date
12/20/2017 12:30:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982155
IBM Index Class Name
REPORT
Doc Date
12/20/2017
Doc Name
Annual Fee/Report/Map
From
Schmidt Construction Co.
To
DRMS
Annual Report Year
2017
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Total acres in various stages of reclamation, since permitted mining activities began: Page 4 of 5 <br /> Total acres Total acres Total acres Total acres <br /> bac01led: 49.2 seeded w/ 14.2 w/topsoil 14,2 mulched w/ N/A <br /> a roved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: 4.2 fertilized w/ N/A replacement 6"to12+„ rate(tans/ac): NIA <br /> a vd fertilizer: depth (in.): <br /> Seed Fertilizer Mulch <br /> application drill application NJA application NJA <br /> method: method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? ES, NO N/A <br /> If"YES",indicate the weed species,control area,control type, application rate and treatment oat on the report map. <br /> 14. Is adequate topsoil reserved tnr reclamation, based on your approved permit? tYES; NO N/A <br /> If"NO",please explain. <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? 'YE NO NJA <br /> If"NO"please explain: �— <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of t�,State <br /> Engineer(Well Permit,S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO N <br /> 17. Are all hazardous materials stored within approved spill containment structures? lyES'� NO N/A <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? ES NO N/A <br /> 19. Is your basis for legal right to enter still valid? (YE NO <br /> 20, Does your permit require you to submit monitoring information annually? YES (� N/A <br /> If-Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S.34-32-116 or 34-32.5-116).attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: YES <br /> NOTE: In the last year a new map was prepared (first one since 1985).Also, 99 acres were <br /> released from band and removed from the permit. Thus, acreages in some categories have <br /> significantly changed due to the release and more current and accurate mapping being <br /> available. But the actual, on the ground features, other than the land mined in the last year, <br /> are very much as they were in the 2016 annual report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.