My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-12-18_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2017-12-18_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2017 9:33:59 AM
Creation date
12/20/2017 9:32:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
12/18/2017
Doc Name Note
Revised
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN7
Permit Index Doc Type
Findings
Email Name
RAR
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Material consistency: <br />1.000 <br />Dozing method: <br />1.200 <br />Visibility: <br />0.800 <br />Job efficiency: <br />0.790 <br />Spoil pile: <br />1.000 <br />Push gradient: <br />1.601 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.929 <br />Blade type: <br />1.000 <br />Net correction: 0.8460 <br />Adjusted unit 641.01 LCY/hr <br />production: <br />Adjusted fleet 2564.04 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.705/LCY <br />Total job time: 11.24 Hours <br />Total job cost: $20,336 <br />Source <br />(AVG.) <br />(CAT HB) <br />(S -BY -S) <br />(POOR) <br />(3 SHIFTS/DAY) <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />Page 2 of 270 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.