My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-12-19_REVISION - P2008052
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008052
>
2017-12-19_REVISION - P2008052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 12:24:09 PM
Creation date
12/20/2017 9:30:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008052
IBM Index Class Name
REVISION
Doc Date
12/19/2017
Doc Name
Request For Surety Release
From
US Energy Corp.
To
DRMS
Type & Sequence
SL1
Email Name
DMC
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NERGY CORP. <br /> t` 950 S. Cherry St. Ph: (303)993-3200 <br /> Suite 1515 www.usnrg.com <br /> Denver, CO 80246 <br /> December 14, 2017 REcLciveD <br /> Minerals Program <br /> DEC <br /> Bond Administrator g 20 <br /> Colorado Department of Natural Resources DIVISION OF RECLA1WATION <br /> Division of Reclamation Mining and Safety MINING AND SAFETY <br /> 1313 Sherman St.,#215 <br /> Denver, Colorado 80203 <br /> Subject: Bond Release and Notice of Completion- P-2007-026 and P-2008-052 <br /> P-2008-052 - SL01 <br /> Late 2017 Annual Report(permit status: MP) <br /> Dear Bond Administrator; No violations <br /> DMC. GRM <br /> Mt. Emmons Mining Company(MEMO)has completed activities of the Subject bonds <br /> and NOIs at the Keystone Mine in Gunnison County, Colorado and requests timely <br /> release of the performance bonds associated with this work. See Figure 1 for locations. <br /> P-2008-052: Work completed includes the removal and demolition of the weather <br /> station. No further work remains to fulfill the obligations of this $1,500 bond. <br /> P-2007-026: Work completed to fulfill bond requirements included upgrading the 2000 <br /> Level Portal, closing the raise between the 2160 and 2000 level adits, and upgrading the <br /> access door on the 1370 Portal. No further work remains to fulfill the obligations of this <br /> $81,349 bond. Specifically,the work completed includes: <br /> • Ore Raise: An access route was created along the existing access road to the area. <br /> A bottom platform was fabricated from 1/4"plywood approximately 30 feet <br /> below ground surface. A urea silicate,two-part foam was proportioned at 1:1 <br /> and placed as base material, accounting for approximately 10-12 feet of material <br /> within the raise. An additional four cubic yards of Foam Concepts material was <br /> placed on the cured urea silicate foam, which accounted for an additional four <br /> feet of foam backfill within the raise. Placed atop the foam was 1-1/2"minus <br /> road-base and native material from the 2000 level excavation. The area was <br /> graded and bermed. See Figure 2. <br /> • 2000 Level Portal: The existing wooden portal structure was removed to the <br /> timber framing in the adit. An 11-foot diameter coated steel culvert was <br /> installed. Placed around the culvert was compacted 1-1/2"minus backfill and <br /> native material. Existing 4"HDPE piping was buried from within the portal to a <br /> point beyond the graded area to facilitate access and snow removal. A fabricated <br /> steel mesh gate and door was installed to control access. See Figure 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.