My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-12-19_REVISION - M1994117
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994117
>
2017-12-19_REVISION - M1994117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:35:19 PM
Creation date
12/20/2017 9:30:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
REVISION
Doc Date
12/19/2017
Doc Name
Request For Amendment To Permit
From
Gold Mill Hill
To
DRMS
Type & Sequence
AM1
Email Name
AME
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
land affected by the installation of the pumping station is approximately <br /> 11,151 square feet, or 0.256 acres. Water will be pumped 4,699 feet up <br /> Akins Gulch in a high-strength two (2) inch diameter, High Density <br /> Polyethylene (HDPE) pipeline that has a one-half (1/2) inch wall thickness. <br /> The HDPE pipe will be connected with heat-fusion welding in the field. <br /> Four check valves and an anti-siphon valve will be installed in the water <br /> pipeline. The Gold Hill Mill Pipeline will be placed on the ground on the <br /> East side of an existing historic mine access road for a distance of <br /> approximately 3,250 feet. The Gold Hill Mill Pipeline will follow this road <br /> until it reaches a point beneath the Gold Ring Mine dump. From this point, <br /> the Gold Hill Mill Pipeline extends approximately 1,450 feet up the hillside <br /> before it reaches an elevation of 8,360 feet, where it will enter the Times <br /> Mine's adit. Except for two short intervals, the pipeline will not be buried, <br /> and its assembly and operation will not disturb the land surface. <br /> The Gold Hill Mill Pipeline crosses property retained for this purpose in a <br /> deeded Easement over the land surface. CIVIC is using a five (5) foot area <br /> of surface disturbance to install the two (2) inch pipeline along the length <br /> of the deeded Easement. The total amount of land that will be affected by <br /> the installation of the pipeline on the Gold Hill Mill Pipeline Easement is <br /> 23,495 square feet, or 0.539 acres. At a location 45 feet below the North <br /> side of County Road No. 52, the Gold Hill Mill Pipeline will enter the portal <br /> of the Times Mine's adit, which passes beneath the County Road. The <br /> Times Mine adit is located on the patented Comet Lode, MS 318, which is <br /> owned by CIVIC. The Times Mine portal consists of a five (5) foot diameter <br /> galvanized steel culvert with a locking metal gate to prevent unauthorized <br /> access. Assuming that an area 10 x 10 feet will be utilized during the <br /> periods when the Times Mine is being entered to monitor water pumping, <br /> the total amount of land surface affected by the use of this portal site is <br /> 100 square feet, or 0.002 acres. Including the Left Hand Creek pump <br /> station, the Gold Hill Mill Pipeline, and the Times Mine portal site, the total <br /> amount of land affected by the installation and operation of the Gold Hill <br /> Mill Waterline amounts to 0.797 acres of surface land. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.