Laserfiche WebLink
November 29, 2017 C-1981-019/Colowyo Coal Mine ZTT <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 8 <br /> <br /> <br />Buckskin Ditch. 2015 and 2016 West Pit reclamation. <br />FISH and WILDLIFE – Rule 4.18: <br />“Rabitat” rock structures have been constructed throughout the 2017 West Pit reclamation parcels. <br /> <br />Large herd of elk was located along the Final East Pit Ditch. Deer and pronghorn were observed throughout the <br />site. <br /> <br />“Rabitat”. <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13 ; Surface Water Monitoring 4.05.13; <br />Drainage – Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9 ; Stream Buffer Zones 4.05.18: <br />The entire length of the North Tributary, East Pit Ditch and Final East Pit Ditch was inspected. Both ditches were <br />w ell armored and no signs of cutting was observed. The Final East Pit Ditch reconstruction reconstruction remains